Refereed Journal Publications:
| Publications |
|---|
| 1. | Gupta, S. R., J. S. Smith, Algorithms for Single Machine Total Tardiness Scheduling with Sequence Dependent Setups, European Journal of Operational Research, (in press), 2005. |
| 2. | Venkatesh, S., J. S. Smith, An Evaluation of Deadlock Handling Strategies in Semiconductor Cluster Tools, IEEE Transactions on Semiconductor Manufacturing, Vol. 18, No. 1, pp. 197-201, 2005. |
| 3. | Valenzuela, J. F, J. S. Smith, J. L. Evans, Allocating Solder-Paste Printing Inspection in High Volume Electronics Manufacturing, IIE Transactions, Vol. 36, No. 12, 2004. |
| 4. | Kakade, V., J., J. F. Valenzuela, J. S. Smith, An Optimization Model for Selective Inspection in Serial Production Systems, International Journal of Production Research, Vol. 42, No. 18, 2004. |
| 5. | Venkatesh, S., J. S. Smith, A Graph-Theoretic, Linear-time Scheme to Detect and Resolve Deadlocks in Flexible Manufacturing Cells, Journal of Manufacturing Systems, Vol. 22, No. 3, pp. 220-238, 2003. |
| 6. | Smith, J. S., S. B. Joshi, R. G. Qui, Message-based Part State Graphs (MPSG): A Formal Model for Shop-floor Control Implementation, Internaltional Journal of Production Research, Vol. 41, No. 18, pp. 1739-1764, 2003. |
| 7. | Smith, J. S., Simulation for Manufacturing Systems Design and Operation, Journal of Manufacturing Systems,, Vol. 22, No. 2, pp. 157-171, 2003. |
| 8. | Sattiraju, S. V., B. Dang, R. W. Johnson, Y. Li, J. S. Smith, Wetting Characteristics of Pb-free Solder Alloys and PWB Finishes, IEEE Transactions on Electronics Packaging Manufacturing, Vol. 25, No. 3, pp. 168-184, 2002. |
| 9. | Son, Y. J., S. B. Joshi, R. A. Wysk, J. S. Smith, Simulation Based Shop Floor Control, Journal of Manufacturing Systems, Vol. 21, No. 5, pp. 380-394, 2002. |
| 10. | Castillo, I., J. S. Smith, Formal Modeling Methodologies for Manufacturing Systems Control: Survey and Comparison, Journal of Manufacturing Systems, Vol. 21, No. 1, pp. 40-57, 2002. |
| 11. | Smith, J. S., B. A. Peters, G. R. Drake, On-line Simulation for Manufacturing Systems Planning and Control, Journal of Design and Manufacturing Automation -- Special Issue on Simulation Modeling and Applications, Vol. 1, No. 3, pp. 207-220, 2001. |
| 12. | Smith, J. S., B. A. Peters, A. Srinivasan, Operations Scheduling in Flexible Manufacturing Systems, International Journal of Production Research, Vol. 37, No. 7, pp. 1541-1560, 1999. |
| 13. | Venkatesh, S., J. S. Smith, B. Deuermeyer, G. Curry, Deadlock Detection for Discrete Event Simulation: Multiple-Unit Seizes, IIE Transactions, Vol. 30, No. 3, pp. 201-216, 1998. |
| 14. | Cho, H., J. S. Smith, R. A. Wysk, A Robust Workstation Controller for Compuer Integrated Manufacturing: Experimental Design and Results, Production Planning and Control, Vol. 8, No. 6, pp. 597-607, 1997. |
| 15. | Smith, J. S., W. C. Hoberecht, S. B. Joshi, A Shop Floor Control Architecture for Computer Integrated Manufacturing, IIE Transactions, Vol. 28, No. 10, pp. 783-794, 1996. |
| 16. | Peters, B. A., J. S. Smith, S. Venkatesh, A Control Classification of Automatic Guided Vehicle Systems, International Journal of Industrial Engineering: Applications and Practice, Vol. 3, No. 1, pp. 26-39, 1996. |
| 17. | Peters, B. A., J. S. Smith, T. S. Hale, A Closed Form Solution for the Optimal AS/RS Dwell Point, International Journal of Production Research, Vol. 34, No. 6, pp. 1757-1771, 1996. |
| 18. | Smith, J. S., S. B. Joshi, A Shop Floor Controller Class for Computer Integrated Manufacturing, Internaltional Journal of Computer Integrated Manufacturing, Vol. 8, No. 5, pp. 327-339, 1995. |
| 19. | Lee, S., R. A. Wysk, J. S. Smith, Process Planning Interface for a Shop Floor Control Architecture for Computer Integrated Manufacturing, International Journal of Production Research, Vol. 33, No. 9, pp. 2415-2436, 1995. |
| 20. | Joshi, S. B., E. G. Mettala, J. S. Smith, R. A. Wysk, Formal Models for Control of Flexible Manufacturing Cells: Physical and System Models, IEEE Transactions on Robotics and Automation, Vol. 11, No. 4, pp. 558-570, 1995. |
| 21. | Wysk, R. A., B. A. Peters, J. S. Smith, A Formal Process Planning Schema for Shop Floor Control, Engineering Design and Automation Journal, Vol. 1, No. 1, pp. 3-19, 1995. |
| 22. | Wysk, R. A., J. S. Smith, A Formal Functional Characterization of Shop Floor Control, Computers in Industrial Engineering, Vol. 28, No. 3, pp. 631-644, 1995. |
| 23. | Smith, J. S., S. B. Joshi, Reusable Software Concepts for Flexible Manufacturing System Control, International Journal of Computer Integrated Manufacturing, Vol. 5, No. 3, pp. 182-196, 1992. |
| 24. | Smith, J. S., P. H. Cohen, J. W. Davis, S. A. Irani, Process Plan Generation for Sheet Metal Parts Using and Integrated Feature-based Expert System Approach, International Journal of Production Research, Vol. 30, No. 5, pp. 1175-1190, 1992. |
| 25. | Gupta, S. R., J. S. Smith, Algorithms for Single Machine Total Tardiness Scheduling with Sequence Dependent Setups, European Journal of Operational Research, (in review), 1990. |
| 26. | Venkatesh, S., J. S. Smith, An Evaluation of Deadlock Handling Strategies in Semiconductor Cluster Tools, IEEE Transactions on Semiconductor Manufacturing, (in review), 1990. |
|
Refereed Conference Publications:
| Publications |
|---|
| 1. | Aksoy, B., V. Ustun, J. S. Smith, Localization Using Discrete Event Simulation, Proceedings of the 2004 Winter Simulation Conference, (in press), 2004. |
| 2. | Mukkamala, P. S., J. S. Smith, J. F. Valenzuela, Designing Reusable Simulation Modules for Electronics Manufacturing Systems, Proceedings of the 2003 Winter Simulation Conference, 2003. |
| 3. | Valenzuela, J. F., J. S. Smith, J. L. Evans, Allocation of Inspection in Serial PCB Assembly, APEX 2003, 2003. |
| 4. | Smith, J. S., Y. Li, J. Gjesvold, Simulation-based Analysis of a Complex Printed Circuit Board Testing Process, Proceedings of the 2002 Winter Simulation Conference, 2002. |
|
|